One Solution™ Dispenser - 伙伴发泡剂

便携式泡沫清洗系统
项目# 125319

One Solution™ Dispenser - 伙伴发泡剂

便携式泡沫清洗系统
项目# 125319
  • Compact design is lightweight and portable for use all around the facility
  • Integrated dilution tips dilute chemicals for accurate, cost-effective use
  • Integrated spray-and-rinse nozzle makes this an all-in-one system

产品描述

The One Solution™ 伙伴发泡剂 is a versatile and convenient foaming, 喷涂, and rinsing system ideal for a wide variety of cleaning applications.  

多用途:
The One Solution™ 伙伴发泡剂 is an innovative and versatile foaming, 喷涂 and rinsing system offering all of these functions in one device.  Choose either the foaming or 喷涂 nozzles to apply rich, 附着泡沫或喷涂溶液, then disengage the chemical supply to provide a thorough rinse using the Sidekick’s integrated rinse function.  Easily select either a wide-angle 喷涂 pattern or a powerful jet-stream simply by rotating the rinse-pattern selector.  The 伙伴发泡剂 is portable and mobile.  There is no need to be tethered to the wall and there is no need to mount to a cart.  Simply attach to a standard water hose and start cleaning.

经济:
The One Solution™ 伙伴发泡剂 is part of State’s One Solution™ dilution program which offers users safe, accurate and cost effective dispensing every time.  The Sidekick utilizes adjustable dilution tips which provide precise dilution ratios ranging from 1:7 on the heavy side all the way to 1:256 on the light side.  Its integrated pressure regulation technology assures that dilution is consistent and accurate even across a wide range of water pressures.    

市场:
学校大学
快餐设施
美食
酒店 & Logding
卫生保健设施
超市及食品零售商

使用说明

1. Find suitable place close to water source for unit. Mounting bracket should be installed approx. 离地面5英尺. 调平支架并标记孔. Drill 9/32” holes and install mounting anchors and screws in bracket. 2. Remove cabinet cover and hang cabinet on bracket. 标记下机柜螺钉孔. 拆卸机柜并钻9/32”孔. Install anchor and screw in lower cabinet hole. When mounting unit, do not mount more than 5 feet from the floor. Also, never mount your concentrate container higher than the unit. Keyhole slots are also provided in the cabinet back if the mounting bracket won’t be used. 3. Select a metering tip (see next section), and insert into hose barb on eductor body. (对所有的教育工作者重复上述步骤.) 4. Supply tube should reach from hose barb on eductor to bottom of the concentrate container. Cut supply tube provided to length required. Slide a ceramic weight over one end of tube and slide a foot valve into the same end of the tube. (为每个导管准备一根导管.) 5. Push other end of supply tube over the hose barb/metering tip on the eductor. (对所有的教育工作者重复上述步骤.) 6. Place foot valve ends of supply tubes into concentrate containers. REMEMBER TO CHECK FOOT VALVE STRAINERS REGULARLY FOR CLOGGING: CLEAN IF NECESSARY. 7. A short discharge tube is used with the 1GPM eductor; minimum tube length is 8 inches (20cm) for proper operation.
Longer tubes (4 feet) are used with a 3.5 . GPM教育. Slide end of tube over eductor discharge outlet. (对所有的教育工作者重复上述步骤.) Hooks may be installed on longer tubes to allow discharge tube to conveniently hang from dispenser when not in use. 8. 更换机柜盖. Guide supply tubes through slots in sides of cabinet cover. Push the sides in, behind the latch holes, to snap the
盖好. The two screws provided may be installed in the holes in the cabinet sides to prevent easy removal of cover. 9. Connect water supply hose of at least 3/8” ID to water inlet swivel. (Minimum 25 PSI pressure, with water running, is required for proper operation.) Connect opposite end of hose to water supply. 打开供水系统. 10. Purge air from the system by depressing the buttons briefly. There may be some water discharge from the eductor 通风口 until the air is purged. 11. Push button to start flow of desired water/concentrate solution, and hold until supply tube is primed (filled). Then push the button whenever dispensing is desired, and release button to stop flow of solution. If you wish to be able to lock the button in the “on” position: Depress button and slide
按钮锁定. 要解锁,请按下按钮并松开. 12. It is essential that the discharge hose not be obstructed. If discharge is restricted, water will flow out the eductor
通风口. Do not start to operate the dispenser with liquid in the discharge tube.

状态是的延伸 你的团队

Our customers of all sizes benefit from the best facility management products.

团队

定制解决方案

团队

专业的服务

团队

经过验证的结果